Thread Content
This post was last edited by HaiChuan LaoYu on 2026-5-23 at 14:56. During the design, installation, and inspection of pipelines, small issues that have been overlooked or not taken into consideration are often discovered. These issues are collected and organized into a series; the list is being updated continuously. Everyone is welcome to actively participate in discussions. This is a compilation post on common problems in HaiChuan pipeline design – it’s still being updated, and discussions are welcome: https://bbs.hcbbs.com/thread-5705828-1-1.html ------------------------------------------------------------------
【Haichuan Chemical Valve Management】Series of Posts -- Why Use Pneumatic Valves in Critical Applications? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5721523 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
【In-depth Discussion on HaiChuan’s Modular Installation】Successful shipment of Module No. 1 for the dock tunnel in Indonesia’s CAA-1 caustic soda project https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5721596 (Source: HaiChuan Chemicals Forum (HuaHaiChuanLiu hcbbs))
[Haichuan’s Guide to Chemical Equipment] Series Post – Trickle Bed Reactor https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5721650 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Haichuan Illustrated Chemical Equipment】 Series Post -- Scraper Filter https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5721706 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))