HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Air supply requirements for the double-acting shut-off valve with DN200 size

2017-06-11View Original

Thread Content

As the title suggests, this shut-off valve operates slowly; sometimes, after not being used for a long time, it fails to open on the first attempt. Moreover, the φ6 air supply pipe used at that time was indeed a bit too long. I know that the air flow might not be sufficient, but could anyone explain the specific calculations or standards related to this?
Reply #22017-06-11
Try changing the diameter of the air supply pipe to 1/2 inch
Reply #32017-06-11
φ6 definitely won’t work; a 1/2 size can be used before the pressure reducing valve, while φ10 or φ12 can be used from the pressure reducing valve to the cylinder.
Reply #42017-06-11
Do we need it to be this thick even after the pressure relief valve?
Reply #52017-06-11
An 8-inch cut-off valve doesn’t require 1/2; a 10 or 12 gauge one is more than sufficient when used after a pressure regulator
Reply #62017-06-12
It is related to the size of the cylinder; it can be calculated based on the desired action time. The 2013 version of the Petrochemical Gas Source Standards provides a formula for calculating such gas sources.
Reply #72017-06-12
8 is about right; 6 is a bit too thin. If you want it to turn on and off quickly, it’s best to install a faster exhaust valve, which will help a lot.
Reply #82017-06-12
It just feels like the 6 before the pressure relief valve is too long, so there isn’t enough air flow
Reply #92017-06-12
I’ll look for this standard; could you tell me its full name?
Reply #102017-06-12
On my end, it seems that the φ6 tube is too long, resulting in insufficient air flow. I was wondering if there is some approximate formula for calculating this air flow

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.