Generally speaking, once a setpoint (sv) is specified for a pneumatic valve, how long does it take for the measured value (pv) to catch up? Is six or seven seconds a reasonable time in this case?
Reply #22017-07-31
I think there’s something wrong with what you said; it should be through PID control so that the final PV equals SV.
Reply #32017-07-31
Yes, but it’s not easy to make the two values equal. In other words, it’s difficult to determine what delay time constitutes a normal range; or rather, it’s hard to figure out at what delay time the PID adjustment is sufficient and within an acceptable level

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.