HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Seeking help with SIS system issues

2018-04-09View Original

Thread Content

What programs are there for SIS system tasks? For example, instrument interlock work tickets – what other types of work tickets are there? What formats are they all in?
Reply #22018-04-10
There isn’t a fixed format for this; generally, it includes the details of the work to be carried out, who applied to disable/re-enable the interlock system, who will carry out the task, followed by signed acknowledgments from various supervisors in separate sections.
Reply #32018-04-10
Management of interlock activation and deactivation; Interlock change management (for adding new interlocks and removing interlocks) ; Interlock calibration, etc
Reply #42018-04-10
Both temporary cutout interlock tickets and work tickets are required
Reply #52018-04-10
There is no fixed format; it generally includes the job details, risk assessment, and preventive measures. The release forms for interlock removal are divided into temporary and long-term types, with signatures from the leaders of various departments appearing at the end.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.