HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Honey DCS image upload

2019-12-01View Original

Thread Content

How can the Honeywell DCS drawings be transferred to other operator stations after they are completed? Also, how can the value of a point be forced? Thank you so much
Reply #22019-12-02
If file sharing is enabled through File Replication, once the files on the server are edited, they will be synchronized after a short while. If this setting is not enabled, simply copy the files from the server to the operation station. To enforce this for a specific point, it is possible to do so within the AI block or by changing the PV SOURCE at the higher-level level
Reply #32019-12-02
"Where is the setting for file sharing in the File Replication screen?
Reply #42023-06-15
Open the Station software, then go to Configure-File replication-abstract.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.