HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Problems in the design phase: fire protection design documents and safety sections

2020-09-25View Original

Thread Content

Gas probe fire protection can be installed in empty factories as per architectural requirements; the accompanying drawings represent the construction plans; The safety section must be arranged after the equipment layout prepared by the process engineering team; the drawing stage is mainly for preliminary design ; Those who work in design institutes, could you please tell me which tasks should be carried out first and which later, according to the process?
Reply #22020-09-25
The fire protection section and the safety section will be designed later, ensuring they are consistent with the construction drawings.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.