HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Must the calibration interval for pressure gauges that are not subject to mandatory inspection be within six months?

2021-03-23View Original

Thread Content

This post was last edited by chenyan4244 on 2021-3-23 at 09:59. According to the JJG 52-2013 standards I found, the calibration interval for pressure gauges should not exceed 6 months. However, the Metrology Law and its implementing regulations state that for instruments that are not subject to mandatory calibration, it is up to the enterprises to establish their own calibration schedules for periodic inspections. I wonder whether, in the case of instruments that are not required for mandatory calibration, an annual inspection would be sufficient
Reply #22021-03-23
Our company conducts inspections every six months.
Reply #32021-03-23
Previously, we also conducted inspections every six months, but with 700 pressure gauges in the entire factory, the cost per calibration was 20 yuan, resulting in a total cost of 14,000 yuan for each set of inspections
Reply #42021-03-23
Those not subject to mandatory inspection do not need to fall within this range!
Reply #52021-03-23
Money is a minor issue; the main problem is that there’s a large amount involved, there may be risks, and one also needs to find someone qualified – it’s quite troublesome
Reply #62021-03-24
For mandatory inspections, we strictly follow a 6-month interval. The issue now is that these third parties who are not involved in mandatory inspections might want to make money by insisting on inspections every 6 months, regardless of whether it’s mandatory or not
Reply #72021-03-24
We hired a third-party testing service; their qualifications are fine. The cost is another issue, and the amount of work involved is indeed substantial
Reply #82021-03-25
It is free to send pressure gauges that are subject to mandatory inspection to the local metrology office; there were documents regarding this as early as 2017. However, the inspection process is slow, and companies generally cannot wait that long.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.