HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Issues regarding the air conditioning room in the instrument control room

2021-06-17View Original

Thread Content

Are there any size requirements for the air conditioning room in the blast-resistant cabinet area? Is that mentioned in the specifications? Does an air conditioning room necessarily require large-scale units? Could you recommend some useful and better manufacturers and models? lol
Reply #22021-06-18
This is generally determined by the HVAC professionals; the control system only provides requirements for the HVAC system, such as the ventilation needs based on the size of the room. A cooling/air conditioning unit is set up first, and if it’s not suitable, the HVAC team will inform you to make adjustments. So go and ask in the HVAC area. .
Reply #32021-06-18
Refer to Chapter 6 of Standard 50779; 3.6 of 20508

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.