HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Feedwater issues in dry quenching coke boilers

2018-05-28View Original

Thread Content

I would like to know: regarding the pumps associated with the feed water in the waste heat boiler for dry quenching of coke, these include the feed water pump, the deaerator circulation pump, the deaerator itself, and the deaerator feed water pump. What is the sequence of their connections? I need an answer urgently. Thank you everyone
Reply #22018-06-02
The deaerator feed pump supplies water to the deaerator, and the water from the deaerator goes to the boiler feed pump. We don’t have a deaerator circulation pump here

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.