What are the precautions to take regarding the construction of coke ovens for a coking project that has been suspended for 6 months?

2021-10-18View Original

Thread Content

Dear experts in the coking industry, our project has been on hold for half a year and is set to resume soon. Two of the coke ovens are ready for the installation of ceiling bricks, while the other one is ready for the construction of access ramps. What tasks need to be carried out during the initial phase of project resumption? Please give some guidance, thank you! !
Reply #22021-10-18
1. First, examine whether the original design is complete; it is advisable to involve a third-party design firm; 2. It is necessary for the design institute to confirm whether the completed work was constructed in accordance with the drawings, whether there are any omitted items, and whether it meets the design quality requirements ; 3. The construction interface between the completed works and the subsequent works needs to be confirmed by the design institute ; Confirmation of the selection between new and old materials ; 4. It is necessary to have the design institute confirm whether there are any design changes to the follow-up projects ; 5. There are no disputes regarding the project contracts for completed projects ; 6. Does the contract for the follow-up work cover the entire project, and is there coverage for the project’s warranty period? .....and so on
Reply #32021-10-19
Thank you for your reply. There are no major issues; I mainly want to know the precautions for rebuilding the coke oven structure.
Reply #42021-10-19
Isn’t the construction of coke oven bodies carried out by specialized manufacturers? They can be asked to submit a construction plan first, which will then be reviewed by the supervisor and the Party A’s technical personnel; once approved, it can be put into execution.
Reply #52021-10-20
Yes, the main concern is whether the construction party has taken these factors into account; the client isn’t sure either. If problems arise, it will be our client who suffers the consequences, so we want to find out in advance.
Reply #62021-10-20
The manufacturer can first bring a preliminary construction plan to the site for explanation; based on any shortcomings and the concerns of the client, the manufacturer should improve the plan before submitting it. Only after approval can the construction team begin work.
Reply #72021-11-07
Check the condition of the furnace body, including the verticality and flatness of the furnace walls, as well as the condition of the brick joints. Check whether the uppermost layer of refractory material is loose; if there are no problems, construction can proceed with the remaining tasks.
Reply #82021-12-24
Check whether the greenhouse is leaking, and if any refractory materials have been exposed to rain. Pay attention to ensuring that the brick types used in the sloped sections are correct; also check the verticality of the walls of the carbonization chamber, as well as whether there are any cracks in the bricks at the top. The mortar layer on the topmost layer of bricks should be removed, and before laying the bricks, clean them with a damp broom to ensure good adhesion between the mortar and the bricks.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.