1. When a container that has stored or contained harmful gases or liquids is opened, it should ( ). (A) Enter immediately to start working. (B) Enter the equipment wearing a filtered gas mask. (C) Analyze the gases inside the tank; entry is permitted only if they are within acceptable limits. (D) Wait for half an hour for gas replacement before entering. 2. Which of the following is the incorrect procedure during shutdown for maintenance? ( ) (A) When maintenance personnel enter equipment that has been purged with N2, they must first blow it out with compressed air; entry is allowed only after the gas sample is found to be satisfactory. (B) During winter shutdowns, water vapor lines must be blown out with compressed air to remove any accumulated water. (C) In winter, for those outdoor equipment pipelines in hard-to-reach areas where water cannot be removed, the equipment must be disassembled to drain all the water. (D) During winter shutdowns, the water drainage valves on the water lines should be opened for drainage, while those on the steam lines do not need to be opened for drainage. CD Note: Answers must be submitted within three days! ! !
Reply #22017-06-26
When a container that has stored or contained harmful gases or liquids is opened, it should be (c). (A) Enter and work immediately. (B) Enter the equipment wearing a filtered gas mask. (C) Analyze the gases inside the tank; entry is permitted only if they are within acceptable limits. (D) Wait for half an hour for ventilation before entering. 2. During shutdown for maintenance, the incorrect approach is (D). (A) When maintenance personnel enter equipment that has been purged with N2, they must first blow it out with compressed air; entry is permitted only after the gas sample is found to be satisfactory. (B) During shutdown in winter, water vapor lines must be blown out with compressed air to remove any accumulated water. (C) In winter, for those outdoor equipment lines and corners where water cannot be removed, the equipment must be disassembled to drain all the water. (D) During winter shutdowns, water drainage valves on water lines should be opened, while steam drainage valves do not need to be opened

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.