Thread Content
What conditions must be met before purifying the gas flow? Answer: ① The minimum circulating volume of methanol in the system operates stably. ②The temperature of methanol entering the washing tower is around -35°C. ③The regeneration system is now working properly. ④The methanol-water separation system is now operating normally. ⑤Methanol spraying and nitrogen stripping have been in operation for over half an hour.
1 The minimum circulation rate of methanol in the system is maintained for stable operation. The methanol temperature in the two-stage scrubber tower is around -35°C. 3 The regeneration system is now normal. The 4 methanol/water separation system is operating normally. The 5 methanol spray and nitrogen stripping systems have been in operation for over half an hour.
①The minimum system methanol circulation rate remains stable during operation. ②The temperature of methanol entering the washing tower is around -35°C. ③The regeneration system is now working properly. ④The methanol/water separation system is operating normally. ⑤Methanol spraying and nitrogen stripping have been in operation for over half an hour.
1 The minimum circulation rate of methanol in the system is maintained for stable operation. The methanol temperature in the two-stage scrubber tower is around -35°C. 3 The regeneration system is now normal. The 4 methanol/water separation system is operating normally. The 5 methanol spray and nitrogen stripping systems have been in operation for over half an hour.
①The minimum system methanol circulation rate remains stable during operation. ②The temperature of methanol entering the washing tower is around -35°C. ③The regeneration system is now working properly. ④The methanol/water separation system is operating normally. ⑤Methanol spraying and nitrogen stripping have been in operation for over half an hour.
①The minimum system methanol circulation rate remains stable during operation. ②The temperature of methanol entering the washing tower is around -35°C. ③The regeneration system is now working properly. ④The methanol/water separation system is operating normally. ⑤Methanol spraying and nitrogen stripping have been in operation for over half an hour.
Answer: ① The minimum circulating volume of methanol in the system operates stably. ②The temperature of methanol entering the washing tower is around -35°C. ③The regeneration system is now working properly. ④The methanol/water separation system is operating normally. ⑤Methanol spraying and nitrogen stripping have been in operation for over half an hour.
1) The minimum methanol circulation rate of the system is maintained at a stable level. 2) The temperature of the methanol entering C-3001 is below –20°C. 3) The regeneration system is operating properly. 4) The methanol/water separation system is functioning correctly. 5) The methanol spraying system and the nitrogen stripping system have been in operation for over half an hour. 6) The spray water used for removing NH3 in the shift reaction unit has been put into use
1) The minimum methanol circulation rate of the system is maintained at a stable level. 2) The temperature of the methanol entering C-3001 is below –20°C. 3) The regeneration system is operating properly. 4) The methanol/water separation system is functioning correctly. 5) The methanol spraying system and the nitrogen stripping system have been in operation for over half an hour. 6) The spray water used for removing NH3 in the shift reaction unit has been put into use
①The minimum system methanol circulation rate remains stable during operation. ②The temperature of methanol entering the washing tower is around -35°C. ③The regeneration system is now working properly. ④The methanol/water separation system is operating normally. ⑤Methanol spraying and nitrogen stripping have been in operation for over half an hour.
1) The minimum methanol circulation rate of the system is maintained at a stable level. 2) The temperature of the methanol entering T0601 is below –20°C. 3) The regeneration system is operating properly. 4) The methanol/water separation system is functioning correctly. 5) The methanol spraying system and the nitrogen stripping system have been in operation for more than half an hour. 6) The spraying water used for removing NH3 in the shift reaction unit has been put into use. 6. What are the steps for the proper startup of the methanol washing section?