Thread Content

In the event of equipment failure, how should chemical industry personnel handle it before sending it for repair? Answer: 1. Shut down the machine or isolate the equipment (install blind flanges, cut off water, electricity, etc.) ; 2. Release pressure and drain completely ; 3. Displacement purging, cleaning ; 4. Maintenance analysis.
Reply #22017-12-14
1. Shut down the machine or isolate the equipment (install blind flanges, cut off water, electricity, etc.); 2. Drain using inclined pressure; 3. Purge and clean through displacement; 4. Conduct maintenance and analysis.
Reply #32017-12-14
1. Shut down the machine or isolate the equipment (install blind flanges, cut off water, electricity, etc.); 2. Drain using inclined pressure; 3. Purge and clean through displacement; 4. Conduct maintenance and analysis.
Reply #42017-12-14
Through processing, the toxic, harmful, and flammable materials inside are removed completely
Reply #52017-12-14
1. Shut down the machine or isolate the equipment (install blind flanges, cut off water, electricity, etc.); 2. Release pressure and drain it completely; 3. Perform displacement purging and cleaning; 4. Conduct maintenance and analysis.
Reply #62017-12-14
1. Shut down the equipment or isolate it (install blind flanges, cut off water, electricity, etc.); 2. Release pressure and drain it completely; 3. Perform displacement purging and cleaning; 4. Conduct maintenance and analysis.
Reply #72017-12-14
1. Shut down the equipment or isolate it (install blind flanges, cut off water, electricity, etc.); 2. Baroclinic drainage ; 3. Displacement purging, cleaning ; 4. Maintenance analysis.
Reply #82017-12-14
Blow out and purge thoroughly, add blind flanges for complete isolation, shut off power, etc
Reply #92017-12-14
1. Shut down the equipment or isolate it (install blind flanges, cut off water, electricity, etc.); 2. Release pressure and drain completely ; 3. Displacement purging, cleaning ; 4. Maintenance analysis.
Reply #102017-12-14
1. Shut down the equipment or isolate it (install blind flanges, cut off water, electricity, etc.); 2. Release pressure and drain completely ; 3. Displacement purging, cleaning ; 4. Maintenance analysis.
Reply #112017-12-14
1. Shut down the equipment or isolate it (install blind flanges, cut off water, electricity, etc.); 2. Release pressure and drain completely ; 3. Displacement purging, cleaning ; 4. Maintenance analysis.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.