The procurement kick-off meeting for the control system of China Coal Yulin Energy Chemical’s coal-to-olefins project will be held

2018-09-29View Original

Thread Content

Meeting on the procurement of control systems for Yanchang Zhongmei Yulin Energy Chemical’s coal-to-olefins project was held. Author/Source: Huahua Network – Coal Chemicals. Date: 2018-09-28. Views: 27. Recently, a meeting regarding the procurement of the DCS and SIS system frameworks for the completion works of the first phase of Yanchang Zhongmei Yulin Energy Chemical Co., Ltd.’s project (the Yanchang Jingbian Phase II project) was held in Tianjin. Relevant personnel from the project’s electrical and instrumentation department, various EPC contractors, as well as suppliers of DCS and SIS systems attended the meeting. It is understood that within the scope of the filling and completion projects carried out by Yueneng Chemical Company, the DCS systems and SIS systems for all facilities are procured through framework agreements. During this framework agreement negotiation session, thorough discussions were held on matters such as the organizational structure for the DCS and SIS system projects, the implementation process, the progress plans for each facility, the work interfaces, the requirements for interconnection, the system network architecture, and the principles for arranging system cabinets, and consensus was reached on these aspects. The DCS system serves as the brain and nerve center of the entire production facility in the project, enabling smooth operation of all production units. The SIS system acts as a safety guardian, ensuring the safety of personnel and equipment in emergency situations. The successful holding of this meeting marks the official commencement of operations related to the control systems of all facilities in the plant. The completion project for the first phase of Yulin Energy Chemical Complex is a key initiative aimed at implementing the requirements set by the Shaanxi Provincial Party Committee and the provincial government to \"enhance the demonstration effect of the comprehensive utilization projects for coal, oil, and gas resources in Jingbian\", as well as the goals of Yan’an Petroleum Group regarding \"changing development models and adjusting the industrial structure\". With an investment of 14.413 billion yuan, this project will use coal and natural gas as raw materials to build integrated facilities capable of producing 1.8 million tons per year of methanol, 600,000 tons per year of methanol-to-olefins products, 400,000 tons per year of polypropylene, and 300,000 tons per year of low-density polyethylene/Ethylene-Vinyl Acetate copolymer (LDPE/EVA). The project is scheduled to be completed and put into operation in 2020; by then, Yueneng Chemical’s polyolefin production capacity will increase to 1.8 million tons per year. This is expected to raise annual sales revenue by 7.338 billion yuan and profits and taxes by 2.1 billion yuan. On September 13, the construction work for the 1.8 million tons per year methanol production plant and various plant-wide system projects at Yueneng Chemical Company commenced ; On September 10, the on-site construction of the 400,000 tons/year polypropylene plant (PP3) and the 110 kV main transformer EPC turnkey project was officially launched ; On August 30, the on-site construction of the 300,000 tons/year LDPE/EVA plant (an integrated facility for low-density polyethylene and ethylene-vinyl acetate copolymer) officially commenced ; On the morning of August 28, the on-site construction of the 600,000-ton methanol-to-olefins plant officially commenced. On August 17, the signing ceremony for the EPC general contract for the filling and completion works of the first-phase startup project of Shaanxi Yanchang China Coal Yulin Energy Chemical Co., Ltd. was held in Xi’an. Li Wei, Deputy Secretary of the Party Committee and General Manager of the company, represented Yueneng Chemical Company to sign EPC/PC turnkey contract agreements with 7 different entities. http://img.yf116.cn/image/img/20180928/1527365565694.jpg
Reply #22018-09-29
Will the procurement meeting start? Among the nine scope of work areas in project management, there are standard descriptions for \"project kickoff\" and \"design kickoff\"; it seems that a description for \"procurement kickoff\" will need to be added in the future.
Reply #32018-09-29
Shaanxi Yanchang China Coal Yulin Energy Chemical Co., Ltd. is a company jointly established by the Shaanxi Yanchang Petroleum Group and China Coal Energy; based on the allocation of EPC/PC general contract responsibilities, the Yanchang Group holds more influence.
Reply #42018-09-29
Procurement also needs to be planned; equipment procurement and the procurement of bulk materials are both systematic processes
Reply #52018-09-29
Can Beijing Petrochemical Engineering, a subsidiary of the group, undertake the three large EPC projects: an 1.8 million tons per year methanol complex, a plant-wide systems engineering project, and a 400,000 tons per year polypropylene plant? Are there any results? I express too much doubt.
Reply #62018-09-29
Collaborate with other design institutes again to act as the overall design institute
Reply #72018-09-29
In fact, during the implementation of many projects, delays occur, and the procurement and transportation of equipment and materials represent an important constraint
Reply #82018-09-29
The capabilities of the Equipment Research Institute are already doubtful, let alone those of the overall research institute? I’m afraid we’ll still have to outsource it to other hospitals.
Reply #92018-09-29
Isn’t this also a way to train oneself by working on one’s own projects?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.