HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Compliance standards for purging each steam pipeline

2019-12-23View Original

Thread Content

To what extent must each steam pipeline be purged to be considered satisfactory? What was the shooting result? What are the criteria for determining that the compressor steam pipeline has been properly purged?
Reply #22019-12-25
This post was last edited by wswwsw3869 on 2019-12-25 08:56. I’m not sure what the guidelines are for design. We comply with the quality acceptance standards for steam purging as specified in Table 9.3.1 of GB 50184. Inspection items and quality standards are as follows: 1. Number of purging cycles: Not less than 3 times. 2. Duration of each purging cycle: 15 minutes per cycle (both purging cycles must meet the requirements). 3. Size of marks on the target plate: Below φ0.6 mm. 4. Depth of marks on the target plate: Less than 0.5 mm. 5. Number of mark points: 1 point/cm2

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.