HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Problems with the gas distributor at the inlet of the methanol synthesis tower

2022-11-09View Original

Thread Content

Problems with the gas distributor at the inlet of a methanol synthesis tower: In one methanol production unit’s reactor, the absence of a gas distributor at the inlet caused the ceramic balls covered by the insulating layer to be blown away; consequently, the insulating-layer catalyst was repeatedly worn down and pulverized by the flowing gas.
Reply #22022-11-09
Catalyst pulverization leads to uneven gas distribution in the bed and an increase in resistance.
Reply #32022-11-15
If there are no conditions to install a distributor, one can try replacing it with larger ceramic balls and adding a steel mesh
Reply #42022-11-17
Shouldn’t the porcelain ball be secured with wire mesh and grating plates? The ceramic ball functions as a gas distributor
Reply #52022-11-19
There is a stainless steel mesh under the original ceramic ball, but none on top of it.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.