Thread Content
**Bid Invitation for Equipment Renovation Project at Xilai Feng Methanol Plant of Energy Group Coal Coking Co., Ltd. Author/Source: Date: 2022-05-31 Clicks: 5 1. Bidding Conditions The name of this bidding project is: Public Bid for Equipment Renovation of Xilai Feng Methanol Plant of the Coking Company. The bidder is **Energy Group Coal Coking Co., Ltd., and the project owner is also **Energy Group Coal Coking Co., Ltd.; the funding for this project comes from internal sources. *This project meets the bidding requirements, and public bidding for domestic qualification review is now being conducted for it. 2. Project Overview and Scope of Bidding 2.1 Project overview, scope of bidding, and division into bid sections (packages): This project is divided into 3 bid sections in total. 2.1.1 Section 1: Retrofit of dynamic voltage recovery systems for key interlock equipment in the methanol plant (1) Project overview: The two induced draft fan motors in the methanol plant are driven by frequency converters and do not have any devices to protect against voltage fluctuations; as a result, voltage fluctuations often cause the fans to stop operating, which in turn triggers an interlock that shuts down the oxygen supply, leading to a shutdown of the entire plant. To ensure the normal operation of the methanol plant, a retrofit is being carried out on the electrical circuit of one of the induced draft fans, involving the installation of dynamic voltage recovery units. (2) Scope of the bid: The contractor shall bear all costs related to the design, manufacturing, transportation, dismantling, installation of all materials and auxiliary materials required for the project, as well as the restoration of associated equipment and facilities, along with the costs of tools and machinery. The project scope includes the supply and acceptance of dynamic voltage restorers and related accessories, the removal of the power cables and associated auxiliary equipment of the existing induced draft fans’ frequency converters, the installation of dynamic voltage restorers and their accessories, the restoration of relevant equipment and facilities, and the completion acceptance. (3) Service period: 60 calendar days after the contract is signed, with the on-site renovation taking 30 calendar days (the specific schedule for the upgrades and renovations will be determined based on the overall progress requirements for maintenance work). 2.1.4 Project location: Xilaifeng Methanol Plant of Energy Group Coking Co., Ltd. 2.2 Others: / 3. Bidder Qualification Requirements 3.1 Qualification and Experience Requirements: [1] Qualification Requirements: (1) Bidders for each bid segment must be legally registered independent legal entities or other organizations, and must provide valid certification documents. 【2】Financial requirements: / 【3】Performance requirements: From January 1, 2017, to the bid deadline (subject to the contract signing date), for Section 1 – Dynamic voltage recovery renovation of key interlock equipment in the methanol plant: bidders must have at least 2 contracts related to the sales or installation of electrical equipment. Bidders must provide contracts that demonstrate compliance with the performance requirements for this tender; the scanned copies of such contracts must include at least the pages bearing the signatures of both the buyer and seller, the date of contract signing, and the key information related to the performance requirements. 【4】Credit requirements: / 【5】Qualification requirements for the project leader: / 【6】Requirements for other key personnel: / 【7】Equipment requirements: / 【8】Other requirements: / Note: Qualifications and performance records of parent and subsidiary companies cannot be used interchangeably. 3.2 Joint bids are not accepted for this project. 4. Acquisition of tender documents *The purchase of tender documents starts on 2022-05-31 at 11:00:00, and the deadline for purchasing them is 2022-06-05 at 16:30:00. *The price per set of the bidding documents is 500.0 RMB per bid section (package); this amount is non-refundable after purchase. The deposit for Technical Documents, Lot 1: 0.0 yuan, to be refunded upon return of the technical documents (without interest). * 5. The deadline for submitting bid documents (the bid closing time, the same below) and the time for opening bids is 2022-06-21 09:00:00 (Beijing time).*
HaiChuan Chemical Forum – HaiChuan Network – [Chemical Currents] Fifth-generation advanced anti-vibration technology; solutions for oil and chemical industries, suitable for 0.4KV and 0.69KV systems; zero-energy consumption anti-vibration power solutions that can save 800... kWh per year. – Powered by Discuz! https://bbs.hcbbs.com/blog-4895200-1230782.html