HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

16 major projects in Junji County, Ordos, resumed work in 2019

2019-09-25View Original

Thread Content

In 2019, work resumed on 16 major projects in Ordos’ Junji District / Source: Yahuah Coal Chemical Industry. Date: 2019-09-23. Clicks: 69. In 2019, Junger District identified and submitted 27 key industrial projects with an investment value of over 100 million yuan each; of these, 13 were new projects while 14 were ongoing projects. The total investment for these projects amounted to 134.878 billion yuan. It was planned to invest 16.5 billion yuan throughout the year, with 3.889 billion yuan invested in the first half of the year. To date, 16 projects in Zhunqi have resumed operations, among which 5 new projects have started construction: Jutai Energy (Ordos) Co., Ltd.’s project to produce 500,000 tons of coal-based ethylene glycol per year; Inner Mongolia Zhongwei Coal Gasification Technology Co., Ltd.’s experimental demonstration project for underground coal gasification; Inner Mongolia Zixin Carbon Co., Ltd.’s project to produce 300,000 tons of sealed carbon products per year; Inner Mongolia Tiechen Engineering Machinery Equipment Co., Ltd.’s project for the assembly and remanufacturing of 200 excavators and 1,000 wide-body dump trucks; and Jutai Energy Inner Mongolia Co., Ltd.’s project for zero discharge of highly concentrated brine. 9 projects that were suspended have resumed construction: these include the 2×660MW ultra-supercritical unit project of Inner Mongolia HuiNeng Group Changtan Power Generation Co., Ltd.; the project to build a mine with an annual production capacity of 10 million tons and a coal washing plant with equivalent capacity by Jungar Banner Guoyuan Mining Co., Ltd. in Longwanggou; the 2×660MW ultra-supercritical unit project of Inner Mongolia Huaxia Zhujiaping Power Co., Ltd.; the second phase of the 2×660MW ultra-supercritical unit project at Inner Mongolia Jingtai Sicaigou Power Plant; the Lianganyao coal mine project with an annual production capacity of 2 million tons by Inner Mongolia Hongran Energy Co., Ltd.; the Changtan project involving an annual production capacity of 20 million tons and a coal washing plant of similar scale by HuiNeng Changtan; the project for the comprehensive utilization of 100,000 tons of coal gangue per year by Inner Mongolia Yuhua Ceramics Co., Ltd.; the project to add a backup boiler to the 200,000 tons/year methanol production facility of Ordos Northwest Energy and Chemical Co., Ltd.; and the 4 billion Nm3/year coal-to-natural gas project developed by Inner Mongolia Beikong Jingtai Energy Development Co., Ltd. Construction has begun on the pre-plant areas for another 2 projects. The preliminary procedures for the industrial demonstration project for the comprehensive utilization of 300,000 tons per year of high-alumina fly ash carried out by Guoneng Zhuneng Resource Comprehensive Development Co., Ltd., have been completed; preliminary design work is underway, and construction in the pre-plant area has started. The related parameters for aluminum electrolysis production have been submitted to the Autonomous Region’s Department of Industry and Information Technology for approval ; The general contract for the construction of Kailuan Inner Mongolia Coal Chemical Co., Ltd.’s 400,000-ton ethylene glycol project has been awarded through bidding, and the construction contractors have begun working on site one after another. The evaluation application has been submitted to the Municipal Development and Reform Commission for approval, while the cultural relics survey application is pending approval at the Autonomous Region Department of Cultural Relics.
Reply #22019-09-25
It’s another methanol and ethylene glycol project.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.