HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Daily Topic】【Electrical Edition 20170324】

2017-03-24View Original

Thread Content

Participation reward: 2 Wealth. Correct reward: 8 Wealth. Multiple-choice question: To ensure that contactor KM2 operates only after contactor KM1 has operated, what is required? ( ) A. Insert KM2’s normally open contact in series with KM1’s coil circuit. B. Insert KM2’s normally closed contact in series with KM1’s coil circuit. C. Insert KM1’s normally open contact in series with KM2’s coil circuit. D. Insert KM1’s normally closed contact in series with KM2’s coil circuit. C
Reply #22017-03-24
A. Insert the normally open contact of KM2 in series in the coil circuit of KM1
Reply #32017-03-24
C. Insert the normally open contact of KM1 in series in the coil circuit of KM2
Reply #42017-03-24
C. Insert the normally open contact of KM1 in series in the coil circuit of KM2

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.