HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

What exactly do the tariff time periods of smart meters refer to?

2018-10-15View Original

Thread Content

The rate periods for smart meters specifically refer to: peak, peak-plus, off-peak, off-peak-low, shoulder-off-peak, and deep-off-peak periods. The most prominent period in the daily load curve of a power system is referred to as the peak period ; The period corresponding to the peak load is called the peak hour ; The period corresponding to low load is called the off-peak period, while the period corresponding to an even lower level of load is called the deep-off-peak period ; The period corresponding to the lowest load is called the off-peak period ; The periods other than peak, summit, trough, saddle, and notch times are referred to as normal periods. Generally, electronic companies in most provinces use the 4-rate time periods.
Reply #22018-10-15
Is there now a time-based charge? I don’t think I’ve heard of it.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.