HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Electrical Technology Daily Question 2018.10.17

2018-10-17View Original

Thread Content

Electric Power Safety Procedures Exam Paper (Substation Specialization): During on-site work, whenever abnormal situations occur (such as a ground fault in the DC system) or circuit breakers (switches) trip, workers must immediately stop working and maintain the current status. They may resume work only after the cause has been identified and it is confirmed that the issue is unrelated to their own tasks; If the abnormal condition or breaker (switch) tripping is caused by normal operation, the scene should be preserved and the operators should be notified immediately so that it can be dealt with promptly.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.