HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Measurement of dielectric loss in the high-voltage bushing of a transformer

2020-01-14View Original

Thread Content

Seeking advice from experts: When measuring the dielectric loss of high-voltage insulating sleeves that are already installed on transformers, is it necessary to use the reverse connection method and test with the transformer windings connected in phase, without removing the sleeves? ? If the high-voltage terminal is measured against the final screen, will the measurement be inaccurate?
Reply #22020-01-21
Hasn’t anyone done it before? ? ? :'(
Reply #32021-04-09
Isn’t the dielectric loss test of high-voltage bushings conducted during the handover before the transformer is installed? It is necessary to lift the sleeve, keep it as vertical as possible, and then perform the measurement using the reverse connection method

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.