HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

How long after the new hydrogen production facility starts operating does pipeline thickness testing begin?

2017-02-16View Original

Thread Content

How long after the new hydrogen production facility starts operating does pipeline thickness testing begin?
Reply #22017-02-16
During one cycle, we stop the operation for maintenance and thickness measurement
Reply #32017-02-16
Our equipment has a lifespan of 3 years, with a cycle of 3 years; testing begins even before maintenance is carried out
Reply #42017-02-16
Our device conducts measurements once a day, while the design requirement is once a week. Since the pipelines carry substances containing solids, it is necessary to measure the wall thickness frequently.
Reply #52017-02-26
Generally, it is checked when parking~~~~

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.