I summarize the handling of slurry bed residue hydroprocessing accidents as a model of \"hot standby with hydrogen, one-pass operation without hydrogen\"
Reply #22021-08-23
There are exceptions; everything follows the standard procedures
Reply #32021-08-23
My summary: fixed fuel cut-off, hydrogen cut-off at boiling point, catalyst cut-off due to excessive slurry
Reply #42021-08-25
The slurry bed had to be reduced to 370°C before the freshing agent was stopped, and during thermal standby, the bed still maintained a stable slurry structure with around 700 ppm of catalyst present.
Reply #52021-08-26
There will be deposition, and the hot standby time is limited
Reply #62021-09-15
ENI recommends no more than one week, with the temperature kept below 370°C, and the furan-insoluble solids level to be <6% W

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.