【Daily Topic】【Engineering Version 20170613】

2017-06-13View Original

Thread Content

Participation reward: 2 Wealth. Correct reward: 6 Wealth. Multiple-choice question: The conditions for a claim to be valid include ( ). A. Compared to the contract, the event has resulted in additional costs for the contractor or direct delays in the project timeline. B. The cause of the loss is not within the contractor’s scope of responsibility as stipulated in the contract. C. Since the loss was not caused by the contractor, it also does not fall under the contractor’s liability according to the contract. D. The contractor submitted a notice of intent to claim and a claim report in a timely manner, in accordance with the procedures specified in the contract. E. It is the contractor’s responsibility, but the loss incurred by the contractor is excessive. ABCD

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.