HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Difference between estimated cost and actual cost

2018-02-05View Original

Thread Content

This post was last edited by qwl on 2018-2-7 08:31. What is the difference between the estimated costs in design institutes and the actual expenses?
Reply #22018-02-05
If it refers to the project costs, the design institute will provide an estimate of the costs; a precise budget won’t be available. As for the difference between these estimates and the actual costs, it probably depends on the owner’s actual level of control over the project, and this difference can vary greatly.
Reply #32018-02-07
Thank you for pointing out the issue. The design institute provides an estimate.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.