HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Requirements for steam pipelines and chemical process pipelines.

2017-06-20View Original

Thread Content

Are there any requirements for chemical pipelines and steam pipelines? When laying steam pipes, should the impact on chemical pipelines be considered? Are there any relevant specifications?
Reply #22017-06-20
Every industry has its own standards, and chemical pipeline design manuals specify the basic requirements.
Reply #32017-06-20
Steam pipelines require acid and grease removal, while process pipelines do not necessarily need it
Reply #42017-06-21
Steam pipes must not be installed side by side with pipelines for flammable and explosive gases or liquids.
Reply #52017-06-22
Banzhu, can you provide some clues? There are too many relevant specifications; I need help.
Reply #62017-06-22
“Code for Pressure Piping – Industrial Piping” (GB/T20801-2006)
Reply #72017-06-22
“Code for Pressure Piping – Industrial Piping” (GB/T20801-2006)
Reply #82017-06-22
Code for Construction of Industrial Metal Piping Engineering (GB50235-2010); For reference only.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.