HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

How long is an appropriate time for an oil tank truck to enter the facility to eliminate static electricity?

2017-06-24View Original

Thread Content

Hello everyone! How long after gasoline and diesel transport vehicles have been delivered to the plant and equipped with static eliminators should wait before starting operations?
Reply #22017-06-25
Is 5 minutes too short? Is there a standard definition for this?
Reply #32017-07-01
Previously, 15 minutes was considered sufficient for safety, but in reality 5 minutes is enough; it can be verified
Reply #42017-07-02
Light oil vehicles generally take 15 minutes, while heavy oil vehicles take 30 minutes. There are standards

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.