HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

[Engineering Version] Daily Question 20171230

2017-12-30View Original

Thread Content

During the construction of a certain project, the engineer had doubts about the quality of the concealed works that the contractor had agreed to cover, and instructed the contractor to conduct re-inspection. The inspection results show that the construction quality of this section does not meet the quality standards specified in the contract, but it satisfies the requirements of industry regulations. Which of the following statements is correct? (  )   A. The contractor has the right to refuse the engineer’s request for re-inspection. B. The engineer shall determine that the quality is satisfactory. C. Neither the lost time nor the additional costs incurred by the contractor will be compensated. D. The contractor’s costs shall be compensated, but the project timeline will not be extended. E. The contractor must repair that portion of the work at its own expense. Correct answers: CE
Reply #22017-12-30
This post was last edited by jslx2012 on 2017-12-30 at 16:43 CE

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.