Large and medium-sized engineering projects should also prepare a construction organization plan for (  ) in accordance with the overall construction organization design.   A. Branches B. Main structure C. Phases D. Auxiliary works E. Underground pipelines Correct answer: AC
Reply #22018-01-12
This post was last edited by tczxs on 2018-1-12 at 16:54. Answer: AC
Reply #32018-01-12
Large and medium-sized engineering projects should also prepare a construction organization plan for ( AC ) in accordance with the overall construction organization design.   A、Branch   B、Main structure   C、Phased   D、Auxiliary works   E、Underground pipelines

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.