When trenching is used for the construction of water supply and drainage pipelines, the cross-section of the trench can take the form of a straight trench, a trapezoidal trench, or a mixed type of trench. Which of the following statements is correct? (  )   A. During the construction of combined trenches, attention must be paid to ensuring mechanical safety.
B. In cases of poor geological conditions during the excavation of mixed trenches, a specialized safety and technical plan should be developed, along with practical safety measures.
C. Ditches for retaining water and draining water should be constructed on the outside of the trenches to prevent rainwater from soaking them, and the source of fill soil should also be protected.
D. The support system for the trenches should be designed taking into account factors such as the soil quality, groundwater level, cross-sectional dimensions of the trench, and load conditions ; The construction party shall provide support in accordance with the design requirements. E. The height of the soil pile formed during trench excavation should not exceed 2.5 m, and it should be at least 1.0 m away from the edge of the trench. Correct answers: ABCD
Reply #22018-01-15
When constructing water supply and drainage pipelines by trenching, the cross-section of the trench can take the form of a straight trench, a trapezoidal trench, or a mixed type of trench. The correct options among the following are ( ABC'D ).   A. During the construction of combined trenches, attention must be paid to ensuring mechanical safety.
B. In cases of poor geological conditions during the excavation of mixed trenches, a specialized safety and technical plan should be developed, along with practical safety measures.
C. Ditches for retaining water and draining water should be constructed on the outside of the trenches to prevent rainwater from soaking them, and the source of fill soil should also be protected.
D. The support system for the trenches should be designed taking into account factors such as the soil quality, groundwater level, cross-sectional dimensions of the trench, and load conditions ; The construction party shall provide support in accordance with the design requirements. E. The height of the soil pile formed during trench excavation should not exceed 2.5 m, and it should be at least 1.0 m away from the edge of the trench
Reply #32018-01-15
When trenching is used for the construction of water supply and drainage pipelines, the cross-section of the trench can take the form of a straight trench, a trapezoidal trench, or a mixed trench; the correct options among the following are (ABCD).   A. During the construction of combined trenches, attention must be paid to ensuring mechanical safety.
B. In cases of poor geological conditions during the excavation of mixed trenches, a specialized safety and technical plan should be developed, along with practical safety measures.
C. Ditches for retaining water and draining water should be constructed on the outside of the trenches to prevent rainwater from soaking them, and the source of fill soil should also be protected.
D. The support system for the trenches should be designed taking into account factors such as the soil quality, groundwater level, cross-sectional dimensions of the trench, and load conditions ; The construction party shall provide support in accordance with the design requirements. E. The height of the soil pile formed during trench excavation should not exceed 2.5 m, and it should be at least 1.0 m away from the edge of the trench
Reply #42018-01-15
A. Attention should be paid to mechanical safety during groove joining construction

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.