During the (  ) stage, the scaffolding and its foundation should be inspected and accepted.   A. After rain or snowfall B. After the soil layer in cold areas thaws C. After each structure is built to a height of 10–13 meters D. Before loads are applied to the working surface E. After strong winds of level 5 or above Correct answers: BCD
Reply #22018-01-30
B、After the soil layer thaws in cold regions C、After each 10–13 m height has been constructed D、Before a load is applied to the working layer
Reply #32018-01-30
B、After the soil layer thaws in cold regions C、After each 10–13 m height is constructed D、Before loading is applied to the working layer
Reply #42018-01-30
A、After rain or snow weather   B、After the soil layer thaws in cold areas   C、After each 10–13 m height has been reached   D、Before a load is applied to the working level   E、After strong winds of level 5 or above
Reply #52018-01-30
B、After the soil layer thaws in cold regions C、After each 10–13 m height is constructed D、Before loading is applied to the working layer

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.