What materials do on-site technicians need to prepare?

2018-02-08View Original

Thread Content

For a larger project, what documents do on-site technicians need to prepare at the company before going to the site?
Reply #22018-02-08
Specifications and drawings related to the construction field.
Reply #32018-02-08
If it is the on-site installation technicians from the equipment manufacturer, they should prepare the relevant installation specifications and technical requirements for the equipment to be installed; the supervisor will require that an installation (construction) plan be submitted for approval; The relevant information for the equipment must be prepared. If possible, it is best to obtain the supervision management system and study it, in order to prepare the relevant materials and plans accordingly. If it is the construction contractor that enters the site, professional installation specifications and technical documents specific to the project are required, as well as an advance understanding of the project team’s management systems and the construction contract with the client.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.