HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

What are the precautions to take when performing regular blowdown on a boiler?

2018-02-10View Original

Thread Content

What are the precautions to take when performing regular blowdown on a boiler?
Reply #22018-02-15
(1) At the lowest point of the boiler water circulation system;  (2) What is discharged is the portion with a high content of water slag ;  (3) Conduct regularly based on the boiler water quality and boiler evaporation rate ;   (4) Conduct it at low load, with each sewage discharge lasting no more than 0.5–1 hour

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.