HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

How long does it take to go through the procedures for safety training at large construction companies?

2018-04-10View Original

Thread Content

How long does it take to go through the procedures for safety training at a large construction company? I’m about to go to a large factory in Beijing to carry out construction work and such.
Reply #22018-04-10
Each company is different, so it is necessary to contact the site where it is located to find out.
Reply #32018-04-10
It depends on the company; I’ve seen it take up to 15 days to obtain an entry permit, while in faster cases it still takes 5-7 days
Reply #42018-04-11
It varies from one company to another; our company generally needs two days, but there are still various procedures to go through every day once you start working, leaving little actual working time
Reply #52018-04-11
Mm-hmm, I guess it will take about a week as well
Reply #62018-04-11
I don’t know; I’ve never worked on construction at this site before
Reply #72018-04-11
I went there as a technician, but I still need to assist the engineering department with some procedures in the initial stage

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.