HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Confirm operations before hot work on process pipelines

2018-06-12View Original

Thread Content

This post was last edited by Jubao Pen Yi on 2018-6-12 at 14:15 – to confirm the procedures to be followed before carrying out hot work on process pipelines
Reply #22018-06-12
This post was last edited by ylb913 on 2018-6-12 at 20:32: Use steam or nitrogen for purging, and ensure that the drain valves at the lowest point are fully open and unobstructed. Sample and analyze the combustible gas concentration before starting work; the explosion limit of combustible gases is >4%, while the acceptable detection level is <0.5% ; The explosive limit of flammable gases is <4%, and the acceptable detection threshold is <0.2%.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.