Which of the following is not a measure item cost? (    )       A. Cost for safe and civilized construction B. Fee for wastewater disposal from the project C. Cost for protecting completed work and equipment D. Cost for scaffolding works E. Cost of using fixed assets Answer: BE 【Explanation】The costs related to preventive measures can be categorized into the following ten items: the first being the cost for safe and civilized construction ; The second is the additional fee for night construction ; Third is the secondary handling fee ; Fourth is the additional cost for construction during the winter rainy season ; Fifth is the cost for the entry and exit of large-scale mechanical equipment, as well as their installation and dismantling ; Sixth is the construction drainage and dewatering fee ; Seventh is the cost of temporary protective measures for above-ground and underground facilities as well as buildings ; Eighth is the cost for the protection of completed projects and equipment ; Nine is the cost for concrete formwork and scaffolding ; Ten is the cost for scaffolding work.
Reply #22018-06-23
B. Engineering waste discharge fee D. Scaffolding project cost E. Fixed asset usage fee
Reply #32018-06-23
D. Scaffolding project cost E. Fixed asset usage fee

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.