HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Fire separation distance between Class B buildings and Class E buildings

2019-02-21View Original

Thread Content

I am working on a project and have encountered a problem: the outer edge of the newly constructed Class B factory is only 9 meters away from the outer edge of an existing Class E factory. This distance does not meet the requirement of 10 meters specified in Table 3.4.1 of the building fire protection codes for the distance between Class B and Class E factories. According to the notes in Table 3.4.1, the exterior wall of the new Class B factory should be a fire wall. Additionally, per Article 6.1.5 of the building fire protection codes, it is possible to install non-removable windows as well as Class A fire-resistant doors and windows with automatic closing functions on this fire wall. However, I have never done this before, so I am not sure whether it is feasible.
Reply #22019-02-25
The building height is not mentioned, making it difficult to determine the fire separation distance. 1. If the higher side is a firewall, there is no limit on the fire separation distance. 2. If at the same elevation, with fire resistance ratings of Class 1 or 2, and the fire resistance limit of either firewall or roof is greater than 1 hour, there is no limit on the fire separation distance. 3. For categories 2, 1, and 2, the firewall should be of low grade; if there are no skylights on the roof, the fire resistance rating must be greater than 1 hour. In cases where there are high openings, these should be equipped with Class A doors, windows, or rolling water screens. The distance between categories A and B should be 6 meters, while the distance between categories C, D, and E should be 4 meters. For categories B and E, a distance of 6 meters should be maintained as a stricter requirement.
Reply #32019-03-05
It cannot be brought close; there is an explanation below – Category A and B items cannot be brought close to these

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.