How to handle the conflict between stone storage regulations and building codes regarding a small quantity of Class A items

2019-11-29View Original

Thread Content

Hello, everyone! The interpretation of Code for Building Design 3.1.4 specifies that as long as a warehouse stores multiple types of materials (such as materials of categories A, B, and C), it should be designed in accordance with Class A standards ; Article 6.6.1 of the Petrochemical Regulations specifies that Class A materials, if their quantity does not exceed 5 tons, can be stored in the same building as Class B and C materials. For a chemical manufacturing company that has less than 5 tons of Class A materials and does not have a separate warehouse for such materials, how should they be stored properly? It’s actually about which standard is more reasonable! I would appreciate your advice! Thank you!
Reply #22019-12-01
But generally, warehouses are located outside the facility, and nowadays experts conduct inspections with very strict requirements; This question is quite tricky~
Reply #32019-12-04
It depends on whether your company’s overall layout is designed in accordance with petrochemical industry standards or building codes. Don’t focus only on the aspects where the petrochemical industry standards require lower requirements; these standards lack specific requirements regarding the area of fire compartments, but they do set higher requirements for fire separation distances. Therefore, if you decide to use the petrochemical industry standards as a guide, the entire plant must be designed in line with those standards.
Reply #42019-12-04
Thanks for the explanation from above! Typically, chemical companies are organized in accordance with petrochemical standards, but for some chemical companies that have been in operation for a long time ; Some spacing requirements are already not being met ; This makes me very worried that issues regarding the differences between these two specifications will arise during the inspection! It is far too difficult for some older chemical enterprises to meet the latest petrochemical and construction regulations at present!

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.