Hello everyone. At present, loading and unloading operations are not allowed in the hazardous chemicals production workshops; such operations must be carried out in the loading and unloading areas of the company’s warehouse storage tanks. But I couldn’t find any mention of this requirement in any standards – neither in the \"Code for Fire Protection Design of Buildings\", nor in the \"Code for Fire Protection Design of Petrochemical Enterprises\", nor in the \"Code for Fire Protection Design of Fine Chemical Enterprise Projects\". That’s why I’m seeking help from all of you: dizzy:
To be honest, it’s not just as simple as saying that filling can only take place in the loading and unloading area, and not in the production workshop. Filling requires certain facilities and conditions. Internally, your products need to be inspected and stored; if they are filled and shipped right at the site, there will be gaps in process management. Furthermore, for different hazardous chemicals, there are many specific requirements regarding the facilities and equipment needed for gas filling, as well as safety measures. These requirements are covered by various standards, which can be referred to through standardized specifications: the section on \"5.6.3 Operational Procedures\" in the \"General Standards for Safety Standardization of Hazardous Chemicals Handling Enterprises\" AQ 3013-2008 ; Requirements of “9.7 Storage and Transportation” in the “Evaluation Standards for Work Safety Standardization of Hazardous Chemicals Handling Enterprises” (Safety Supervision General Administration Order No. 32011, Article 93). Of course, there are also some specific regulations, which will not be detailed here. If, by comparing them with these requirements, you believe that the standards can be met, you can argue your case. However, in general, if it isn’t a filling device specifically designed and installed, you probably won’t get approval!
The company needs to handle the process of obtaining a filling certificate; only with such a certificate can loading take place. Both hardware and software requirements, as well as other management aspects, must be met before loading is possible
I’m referring to whether tank trucks of type A and B can be used for loading and unloading at workshop tanks
I’m referring to whether tank trucks of type A and B can be loaded and unloaded at the workshop tanks. Experts say it’s not possible, but they can’t find the source.
All you need to do is check whether your filling site meets the requirements for filling, and whether the overall layout complies with the spacing requirements. There’s no need to worry about which regulation dictates where you can fill it up: lol