I would like to consult you regarding a major hazard source: we use a solvent that falls under Category 3.2, and since it needs to be distilled and purified regularly, this is done at atmospheric pressure. During the operation, the temperature exceeds its boiling point; therefore, when identifying major hazard sources, the critical threshold is set at 10 tons. Since the normal amount used in the purification process is 12 tons, this amount is classified as a major hazard source. Are there any measures that can be taken to prevent it from being considered a major hazard source? At present, our measure is to limit each operation to no more than 10 tons, but it’s very troublesome to do so.
This is really tricky. Could it be handled separately?
Is this production order not considered a major hazard source? Just use smaller storage tanks in the operation process; of course, this is possible as long as production can still proceed: lol
Consider everything comprehensively; it’s best to carry out technical upgrades.
One must weigh the options themselves; if the difficulty and risks associated with managing major hazard sources are high, then consider changing the manufacturing process and adjusting the production facilities in order to reduce the amount of hazardous substances present. In short, only one oneself knows what needs to be done; it all revolves around economic benefits and safe production