The last edit to this post was made by Zhizhi Ming on 2024-12-4 at 12:10. 1. A detailed list or catalog of the documents related to project handover; 2. Completion acceptance report; 3. Construction organization plan; 4. Process flow diagrams; (PID diagrams: key information about the entire installation, operating conditions such as temperature, pressure, and flow rates, material balance, etc.); 5. Civil engineering construction drawings; (paper version, electronic version); 6. Mechanical completion drawings; (paper version, electronic version); 7. Electrical completion drawings; (paper version, electronic version); 8. Instrumentation and automation system completion drawings; (paper version, electronic version); 9. Diagrams of wear-prone components; (list of wear-prone components); 10. Records of various types of commissioning, testing, inspections, and construction changes; 11. List of process equipment or equipment inventory; (name, specifications, parameters, quantity, installation location, tag number); 12. List of spare parts’ specifications and models; (manufacturer, specifications, parameters, contact information); 13. Operating procedures documents; (paper version, electronic version); 14. Equipment maintenance manuals or procedures; (paper version, electronic version); 15. System PLC and automatic control operation procedures; (paper version, electronic version); 16. Equipment factory certificates of conformity, user manuals, quality certificates for special materials, and inspection reports; 17. Documents related to the handover of special equipment; (Sealed drawings, quality certificates, registration certificates, initial inspection reports, etc.) 18. Documents related to safety accessories for special equipment ; (Safety valve and pressure gauge inspection reports) 19. Other handover documents: business license, corporate qualifications, contracts, technical agreements ; 20. Contracts for design, construction, and supervision, as well as documents relating to the qualifications of the contractors. Requirements: 1. Materials related to specialties such as machinery, electrical engineering, instrumentation, and inspection should be received by respective technical personnel in those fields; 2. All documents handed over must come with an accompanying list; 3. All materials should be placed in archive bags, with a list included in each bag; (an electronic version may also be required, depending on the circumstances); 4. All materials must be provided in two copies.
The completion and handover documents for plant engineering include: 1. A detailed list or catalog of the handover documents; 2. Completion Acceptance Report ; 3. Construction organization design ; 4. Process Flow Diagram (PID diagram) ; 5. Civil engineering construction drawings (paper and electronic versions) ; 6. Mechanical as-built drawings (paper and electronic versions) ; 7. Electrical as-built drawings (paper and electronic versions) ; 8. As-built drawings of instruments and automatic control systems (paper and electronic versions) ; 9. Diagrams and list of vulnerable parts ; 10. Debugging, commissioning, inspection, and construction change records ; 11. List of process equipment or equipment inventory ; 12. List of specifications and models for spare parts ; 13. Operating procedure documents (paper and electronic versions) ; 14. Equipment maintenance manual or procedures (paper and electronic versions) ; 15. System PLC, system automatic control operation procedures (paper and electronic versions) ; 16. Equipment factory certification, user manual, quality certificates for special materials, and inspection reports ; 17. Handover documents for special equipment ; 18. Documentation on safety accessories for special equipment ; 19. Other handover documents: business license, corporate qualifications, contracts, technical agreements ; 20. Contracts for design, construction, and supervision, as well as documents regarding the qualifications of the contractors. Requirements: 1. Materials related to different specialties should be received by the corresponding technical professionals ; 2. The handover documents must include a complete list ; 3. The documents should be placed in file folders, each containing a list ; 4. The documents are provided in two copies. .