HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

What are the methods for adjusting the overpressure at the top of the coking stabilizer?

2017-03-09View Original

Thread Content

Should the cold bypass be activated or the hot bypass?
Reply #22017-03-11
1. Adjust the cooling capacity of the liquefied gas cooler. 2. Adjust the carbon dioxide content in the liquefied gas
Reply #32017-03-12
Operate on the cold route to lower the temperature at the bottom of the tower, increase the temperature in the separation tower, and reduce the amount of non-condensable gas

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.