HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Over-dimensional transportation of tower equipment

2017-05-23View Original

Thread Content

How is a permit obtained for the over-dimensional transportation of tower equipment? Should the carrier handle it before the equipment leaves the factory, or should the truck driver handle it while transporting it, applying for a permit each time they pass through a certain location? How is it charged? Should costs in this area be considered when purchasing equipment? Should the delivery time required take transportation time into account?
Reply #22017-05-23
It is handled jointly by the carrier and the equipment manufacturer before the equipment leaves the factory; the process is carried out at each location passed through. As for what documents need to be provided, that’s not clear.
Reply #32017-05-23
These costs should be taken into account when purchasing equipment. Including compensation for the facilities demolished along the way.
Reply #42017-05-23
1. If a motor vehicle carrying oversized items must travel on roads with specified limits and such travel endangers traffic safety, it shall proceed at the times, along the routes, and at the speeds designated by the traffic management department of the public security authorities, and must be equipped with visible signs. 2. The carrier responsible for transporting oversized goods must submit an application to the local traffic police department in the districts or counties through which the shipment will pass. They must provide the traffic management authorities with accurate information regarding the geometric dimensions and weight of the goods, as well as documents such as the vehicle registration certificate and identification proof of the person handling the shipment. 3. The district and county traffic police teams must verify the vehicle and its registration documents, and inspect the basic details of the oversized items (geometric dimensions, weight, whether they can be disassembled, etc.), the condition of loading, as well as any other factors that may affect road safety. 4. The district and county traffic police departments shall, based on the results of vehicle inspections, and in accordance with relevant laws and regulations such as the Road Traffic Safety Law of the People’s Republic of China and its implementing regulations, determine the time, route, and speed at which motor vehicles carrying oversized items may travel. They shall also issue the \"Shandong Province Permit for Vehicles Carrying Oversized Items\" (hereinafter referred to as the \"permit\"); one permit is issued for each shipment, and its validity period does not exceed 15 days.
Reply #52017-05-24
I have to go to a certain place to handle it; I have to wait there. How long will it take to get it done?
Reply #62017-05-24
If you go and give notice in advance, it generally won’t cause any problems for you

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.