How to clean the vapor line at the top of the atmospheric and vacuum distillation columns as well as the vacuum system before the first operation?

2019-07-21View Original

Thread Content

How to clean the overhead vapor line and vacuum system of a atmospheric and vacuum distillation unit before its first operation? Thank you!
Reply #22019-07-23
The atmospheric pressure tower top can be flushed with top reflux; the water can be retained in the reflux tank and vented, or the pump inlet flange can be removed at the acid water pump to drain it. When performing flushing under reduced pressure, I recommend disassembling the ejector to prevent welding slag from causing blockages
Reply #32019-08-30
1. Flush the corresponding pipelines when pressurizing water for drainage; 2. During the startup steam purging and pressure testing, use steam to purge the pipelines ;
Reply #42019-11-30
Use steam for airtight purging at the start of operation, and complete it in one go

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.