The entire process of tower lifting

2017-06-08View Original

Thread Content

Throughout the tower lifting process, everyone is welcome to share their different opinions so that we can improve together.
Reply #22017-06-08
How tall is the tower? What are the requirements for levelness?
Reply #32017-06-08
Thank you for sharing the lifting process; lifting and positioning large equipment is indeed very complicated, requiring coordination among multiple parties.
Reply #42017-06-08
Thank you for sharing the lifting process; lifting and positioning large equipment is indeed very complicated, requiring coordination among multiple parties.
Reply #52017-06-08
Levelness is required only when installing the tower internals; it is generally measured using a level or a U-tube. For specific requirements, refer to the standard HGJ211-1985 _ Code for Construction and Acceptance of Chemical Tower Equipment.
Reply #62017-06-08
Levelness is required only when installing the tower internals; it is generally measured using a level or a U-tube. For specific requirements, refer to the standard HGJ211-1985 _ Code for Construction and Acceptance of Chemical Tower Equipment.
Reply #72017-06-08
Levelness is required only when installing the tower internals; it is generally measured using a level or a U-tube. For specific requirements, refer to the standard HGJ211-1985 _ Code for Construction and Acceptance of Chemical Tower Equipment.
Reply #82017-06-08
Our tower is 35 meters tall. Levelness is required only when installing the internal components of the tower, and it is generally measured using a level or a U-tube. For specific requirements, refer to the standard HGJ211-1985 _ Code for Construction and Acceptance of Chemical Tower Equipment.
Reply #92017-06-08
Sometimes multiple cranes are needed to work together for lifting~~~
Reply #102017-06-08
The lifting process for the large towers at Sinopec is always the same.
Reply #112017-06-08
Specialty: victory:

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.