HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Why is the safety valve on the outlet pipeline after ammonia washing in the ammonia washing tower located at the bottom of the pipeline?

2018-10-31View Original

Thread Content

Normally, it leads out from the top; why does this one lead out from the bottom? Could you explain that?
Reply #22018-10-31
It shouldn’t be possible to tell from the PID diagram whether it’s the bottom or the top of the outlet pipe, right? And when the equipment is installed, the safety valve should also be placed in the gas phase space
Reply #32018-10-31
The poster had better first check whether the pipelines on site are connected at the lower part
Reply #42019-02-21
Whether it is for drainage and anti-freezing purposes needs to be discussed with the designer!
Reply #52019-02-22
Since there is no special indication on the PID, it only indicates the process route; on-site construction is carried out according to the on-site pipe layout diagram. If the person asking wants to know for sure, they can check the pipe layout diagram
Reply #62019-03-08
PID does not represent the pipe layout.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.