HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Operations before opening containers such as the tower bottom

2019-08-02View Original

Thread Content

There is a distillation tower containing a flammable liquid (with a flash point of around 300°C) and its vapor. If maintenance work on the tower is required, it is necessary first to remove the flammable liquid, then to wash the tower with water, and finally to displace the flammable gases inside the tower with nitrogen. I would like to ask what components need to be analyzed after replacing the combustible gas before the tower can be started up? What are the standards for these components to be considered qualified? Is there any evidence? Are the analysis requirements for starting up a tower the same as those for performing hot work on a tower? Please help resolve this confusion! I saw a set of operating procedures stating that nitrogen should be used to displace flammable gases before starting the tower, with the requirement that the explosive concentration be less than 5%. What does this mean? Right?
Reply #22019-12-27
The acceptance criteria depend on the lower limit of the explosive limit for flammable liquids

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.