Is there no shut-off valve on the pipeline from the tower top to the condenser?

2020-04-19View Original

Thread Content

The specifications state: No isolation valve shall be installed on the pipeline from the top of the tower to the condenser? May I ask why? Thank you!
Reply #22020-04-19
At the beginning of the problem, you should indicate the document name with the citation number for the \"regulations\", and then include your process diagram – it will be easier to explain things by referring to the diagram. Additionally, coolers are installed at the top of the tower; there are also those with an inner and outer section, as well as various types of installations. It is usually due to process requirements. It’s better to start by learning the principles of the process.
Reply #32020-04-20
Probably to minimize the pressure drop. Additionally, there are valves at both the inlet and outlet of the condenser, so there is no need to install additional shut-off valves; they are hardly used at all
Reply #42020-04-21
A condenser is not used to reduce pressure drop, but valves should be installed at its inlet and outlet and kept fully open
Reply #52020-04-21
Why is it done without installing valves in order to reduce pressure drop? Valves increase resistance loss. But it’s really not necessary to add a cut-off valve. As the pressure of the gas at the top of the tower decreases, the boiling point drops, requiring a lower temperature and more cooling capacity for condensation
Reply #62020-04-21
There is still some pressure loss even when the valve is fully open. In order to keep the vapor pressure of the condensate in the top condenser as close as possible to the top pressure of the tower, no shut-off valves are installed on the pipeline from the tower top to the condenser, unless there are special requirements for process control.
Reply #72020-04-24
Thank you all for your help, thank you!

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.