HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Are there any requirements regarding the length of the inlet pipeline for cam pumps?

2022-05-14View Original

Thread Content

The inlet location and piping of the original cam pump have been modified. The cam pump was originally located on the south side of the tank, with its inlet also on the south side; now the inlet has been moved to the north side of the tank, an increase of almost 10 meters. After the modification, the pump does not deliver any flow – could it be that the inlet piping is too long?
Reply #22022-05-15
Is there a check valve at the pump inlet, and how is the air discharge inside the pump??? Additionally, a pipe should be installed at the location where the wall is penetrated, to prevent the equipment from being damaged by stress changes. For reference.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.